How do we work?
In general use we work "off-site". The procedure is shown
in the next picture.
Plant for treatment of contaminated soil
Sometimes we work "on-site", e.g. in the period from December 2008
to August 2009. Have a look at the following part.
Tent for pretreatment
Construction of heap
Sealing the area for treatment
Separation of excavated soil
View to the treatment facility
Last not least
we would like to inform you about our current projekts for near the future:
- We are building up a smart system for recovery of sewage sludge.
- We are looking for a solution to treatment of material which is
polluted with explosives.
- We are investigating a possibility to use sewage sludge for the
recultivation of landfills.
--> Back Site
